IPF5 Technical Assistance: Preparation of Preliminary Design and Environmental and Social Impact Assessment (ESIA) for Podgorica bypass (Smokovac-Tolosi-Farmaci) of Bar-Boljare highway (SEETO Road Route 4), Montenegro

Bar- Boljare Highway is approximately 169 km long of high priority and significance and provides a strategic link between the [...]

Connectivity Networks Gap Analysis- IPA 2011-WBIF-Infrastructure Project Facility-Technical Assistance 3 EuropeAid

The Connectivity Gap Analysis identified the compliance gaps of the entire Western Balkans (WB) Core Network against the TEN-T [...]

2018-11-16T00:10:15+02:0002/11/2018|Services, Transport Policy - Strategy|
Go to Top