International Airport of Heraklion, Crete: Study of Accessibility to Facilities / Uses of the new Airport

The Accessibility Study to Facilities/ Uses of the New International Airport of Heraklion, Crete (Kasteli) has been completed by SYSTEMA [...]

IPF5 Technical Assistance: Preparation of Preliminary Design and Environmental and Social Impact Assessment (ESIA) for Podgorica bypass (Smokovac-Tolosi-Farmaci) of Bar-Boljare highway (SEETO Road Route 4), Montenegro

Bar-Boljare Highway is approximately 169 km long of high priority and significance and provides a strategic link between the port [...]

IPF5 Technical Assistance: Detailed Design for Tirana Road Bypass (Kashar – Vaqarr – Mullet), Albania

After completion, Tirana bypass will provide a motorway link between the existing highway Tirana – Durres and the new motorway [...]

IPF5: Main Designs for the Rehabilitation of 90 concrete bridges on the “Bar-Vrbnica” Railway Line, Montenegro

In an effort to ensure the functionality of the railway line Vrbnica-Bar in Montenegro, as well as to increase its [...]

Feasibility Study for priority bypasses on the Montenegrin Coast

Within the framework of this project, we developed a feasibility study for the construction of priority bypasses around the cities [...]

Go to Top